Subject: 19 June Conference Call Notice




Business Process Team

The BP PT will hold its next conference call on Monday 19 June at 12:00 p.m. US
EDT. The agenda for the call follows:

1. Review proposed changes to the metamodel (Karsten Riemer)
2. Review  comments on submitted to date on the BP Modeling Specification (Bob
Haugen)
3. Review BP metamodel model entity descriptions and mapping to eCo (Brian
Hayes)
4. Review Brian Hayes' document on CC Context (Brian Hayes)
5. Review PT work plan as prepared by Marcia McLure (see below)
6. Review other action items from 5 June.
7. Methodology meeting with UN/CEFACT TMWG 17-21 July, Minneapolis

NOTE A CHANGE IN DIAL-IN INSTRUCTIONS FOR ALL CALLERS:

If calling from within the US, access the call by dialing (877) 865-4366
followed by a PIN of 175890#.  If calling from outside the US, dial +1 (973)
321-2004 followed by a PIN of 175890#.  Call duration will be up to 1.5 hours.

The report of the 5 June conference call is attached.

Best regards,

Paul Levine
(See attached file: BP_PT_05JUNE2000.doc)



ebXML Business Process Project Team

Milestones and Work Plan

Revised 6/7/00

May 26 Submit first draft BP Technical Specification to full ebXML Work Group
for review and comment

        June 5 BP Conference Call 9am PCT

        Team Assignments:

    a.. Request confirmation from ebXML Steering Committee that the BP PT
Technical Specification is still on track for a vote at the August plenary
meeting.
    b.. Karsten: send Bob the demo-case collaboration diagram to further
illustrate the metamodel.
    c.. Brian: revise descriptions based on the latest ebXML descriptions and
forward them again to ebXML after internal review.
    d.. Karsten: forward Comment/Resolution Spread Sheet for posting and
tracking issues and resolution
    e.. Bob: provide collaboration diagrams for the auto example in time for
Brian

Ęs 20 June meeting with the CC PT members;
    f.. Brian: distribute a CC PT writeup of a "context" example from the
Brussels meeting.
    g.. Paul: collect comments until official editor is declared
    h.. Marcia: include the activities of demonstration by example and
collaboration with the CC PT, as identified above, in the Work Plan along with
the critical dates relative to the BP Modeling Specification.
    i.. All Team: Review BP PT Spec on the BP PT website; ID PT members to map
BP PT meta-model to existing frameworks; ID Editors; contact Jim Clark to relay
the importance of his participation in BP PT.
    June 9 Close of 1st Comment Period June 19 BP

    June 19 Conference Call 9am PCT


    June 20 Team Member Assignment: Brian will meet with Core

Component representatives Arofan Gregory and Sue

Probert to determine the CC PT meta-model status and

fit within the BP PT meta-model.

    June 23 Submit BP PT Approved Technical Specification Revision and log of
comment disposition to full

ebXML Work Group

    July 3 BP Conference Call 9am PCT

    July 7 Close of 2nd Comment Period

    July 16-17 ebXML BP Project Team Interim Meeting

    Minneapolis-Minneapolis: work the BP technical specification

    July 21 Submit BP PT Approved Technical Specification Final Revision and log
of comments disposition to   full ebXML Work Group

    July 31 BP Conference Call 9am PCT



    August 7-11   ebXML San Francisco Plenary Meeting

    November     ebXML Tokyo Plenary Meeting

    February 5-9 ebXML Vancouver Plenary Meeting

    May 7-11        ebXML Vienna Plenary Meeting

If there are any additions or corrections to the BP PT Work Plan, please send to
marcia.mclure@mmiec.com. Thank you.



Issue: Is the BP PT Technical Specification still considered on track for the
"ebXML Plenary Vote" option in August given the difficulty experienced in
posting the specification to the ebXML website ?

The answer is "yes."

See ebXML Steering Committee e-mail responses below:

6/5/00 Klaus writes:

It has been over a week now that I have sent on behalf of the BP
and Architecture team their draft specification in pdf form to
Brent. However, they are not shown under on our web site under
"Drafts - Open for Comments".

6/7/00 In response to the BP PT question related to "on track" BPPT Technical
Specification, Klaus writes:
In order to overcome the missing links under the "Drafts:
Open for Comment" page for the Architecture, BP and Core
Component Draft Specification, Klaus will post the links on
the ebXML (General) list. The StC agreed not to change the timetable because of
the problems with the links being made public outside their
list members.

The BP PT URL to view the specification is identified below:


http://www.ebxml.org/working/project_teams/business_process/ebXML_BP_PT_TechnicalSpec5.25.00.pdf



Marcia McLure

Co-Lead BP PT








Mac Word 3.0



[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [Elist Home]

Search: Match: Sort by:
Words: | Help


Powered by eList eXpress LLC