Subject: Re: Submission of new TA specification DRAFT
MArty: Thank you for the prompt reply and comments. After reading these, I don;t think we would have any problem changing the section as per your comments. This would still meet our needs of specifying the functional requirements for the TPP team. If we change these items, do you feel that our spec would meet your needs and enable you to complete your work? We wish to get each of the teams to basically review the generic sections plus the section that applies specifically to their domain (scope). I feel we could very easily reach this consensus. Rik: The Transport stuff is largely based on a working liaison between our teams. I believe it should meet with your approval however, can you please revisit it briefly. Lisa: Please look at the COre Components, CBO's and there are also a couple of implementation issues that touch on run time context and design principles. PLease let us know your comments ASAP (even though this document hasn;t received official submission status from the QA Team, I want to get the ball rolling.) On a personal note - I am very excited about the latest specification. I think we are well on our way to meeting our targets for Vancouver. I want to thank all those who have taken the time to aide the TA Team in this presentation. Everyone has been very instrumental in the collaboration you see before you. Duane Nickull
Powered by
eList eXpress LLC