Subject: RE: Test Indicator Issue
Bob, see response inline: > > The tables which select the URL to which to deliver the payloads, whether > these tables be in the application code on in some middleware, > would have to > differ between the production system and the test system. And there might > be dozens of URL's each of which needs both a production and a development > entry. And the tables might be stored in the same database as > other tables, > so when a database is copied from production to test, the changes > have to be > re-introduced. > If I understand your point correctly you're saying that by having a test flag you're able to maintain the same data in both a test and production database and can easily copy data between the two, correct? If so, then I think one could say the same thing when two separate URL's are used, for example: http://test.company.com/ebxmlhandler and http://production.company.com/ebxmlhandler Both URL's could share a single trading partner database instance, but use separate processing logic on the application payload. Dick Brooks Group 8760 110 12th Street North Birmingham, AL 35203 dick@8760.com 205-250-8053 Fax: 205-250-8057 http://www.8760.com/ InsideAgent - Empowering e-commerce solutions > -----Original Message----- > From: Miller, Robert (GXS) [mailto:Robert.Miller@gxs.ge.com] > Sent: Monday, November 27, 2000 10:08 AM > To: ebxml-transport@lists.ebxml.org > Subject: RE: Test Indicator Issue > > > List-Unsubscribe: > <mailto:ebxml-transport-request@lists.ebxml.org?body=unsubscribe> > List-Archive: <http://lists.ebxml.org/archives/ebxml-transport> > List-Help: <http://lists.ebxml.org/doc/email-manage.html>, > <mailto:ebxml-transport-request@lists.ebxml.org?body=help> > > Dick, > > The tables which select the URL to which to deliver the payloads, whether > these tables be in the application code on in some middleware, > would have to > differ between the production system and the test system. And there might > be dozens of URL's each of which needs both a production and a development > entry. And the tables might be stored in the same database as > other tables, > so when a database is copied from prodcution to test, the changes > have to be > re-introduced. > > Cheers, > Bob > > -----Original Message----- > From: Dick Brooks [mailto:dick@8760.com] > Sent: Monday, November 27, 2000 9:56 AM > To: Miller, Robert (GXS); Nikola Stojanovic; > ebxml-transport@lists.ebxml.org > Subject: RE: Test Indicator Issue > > > Bob, > > I don't understand how separate test/production URL's does the following: > > > referenced below. But I contend that these other ways reduce the > > parallelism of the test system to a greater extent than does a > test flag. > > Please explain. Thanks. > > > Dick Brooks > Group 8760 > 110 12th Street North > Birmingham, AL 35203 > dick@8760.com > 205-250-8053 > Fax: 205-250-8057 > http://www.8760.com/ > > InsideAgent - Empowering e-commerce solutions > > > -----Original Message----- > > From: Miller, Robert (GXS) [mailto:Robert.Miller@gxs.ge.com] > > Sent: Monday, November 27, 2000 9:23 AM > > To: Nikola Stojanovic; ebxml-transport@lists.ebxml.org > > Subject: RE: Test Indicator Issue > > > > > > List-Unsubscribe: > > <mailto:ebxml-transport-request@lists.ebxml.org?body=unsubscribe> > > List-Archive: <http://lists.ebxml.org/archives/ebxml-transport> > > List-Help: <http://lists.ebxml.org/doc/email-manage.html>, > > <mailto:ebxml-transport-request@lists.ebxml.org?body=help> > > > > Yes there are other ways to indicate a 'test' message, two of which are > > referenced below. But I contend that these other ways reduce the > > parallelism of the test system to a greater extent than does a > test flag. > > Use of a test flag is a proven practice. So my advice is add the > > test flag - > > "If it ain't broke, don't fix it!" > > > > Cheers, > > Bob Miller > > > > -----Original Message----- > > From: Nikola Stojanovic [mailto:nhomest1@twcny.rr.com] > > Sent: Monday, November 27, 2000 8:57 AM > > To: ebxml-transport@lists.ebxml.org > > Subject: Re: First issue [was: Outstanding Issues - LONG please red to > > end} > > > > > > <Dick Brooks> > > There are others means to indicate a "test" versus "production" message > > exchange. For example: > > - separate production and test ebxml handler URL's (mailboxes, > FTP sites, > > etc.) > > - separate production and test Party ID's > > </Dick Brooks> > > > > Makes sense. I agree. > > > > Nikola > >
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [Elist Home]
Powered by eList eXpress LLC