[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [Elist Home]
Subject: Issue: We need separate acknowledgment and delivery receipt eleme nts
Section 8.13 Acknowledgment Element. I think we need to fix the acknowledgement element so that you can have, in one message,both: · a "MSH acknowledgment" resulting from the ackRequested being set to true, and also · a "DeliveryReceipt Acknowledgment" arising from DeliveryReceiptRequested being set to true. Currently if we have syncReply set to true (see lines 2444-7), then although both are requested, only one could be returned. Having two elements would solve this problem: the current acknowledgement element and a separate Delivery Receipt element with essentially the same structure but a different meaning. Changes required are as follows ... · Line 1131. Add to the end of the line. "It is included in an ebXML Message as a result of ackRequested being set to true (see section xx)." · Line 1140. Delete line for "type attribute" entry · Lines 1163-1171. Delete the section on type attribute. · After Line 1180. Add a new section as follows ... 8.14 DeliveryReceipt Element The DeliveryReceipt element is used by a To Party that is the final destination of a message to indicate to the From Party, that sent the message, that the message has been received. The DeliveryReceipt element has the same structure and content as the Acknowledgement element (see section xx). · We will also need to fix the introduction and schema to reflect the existence of the new element. Solution Strategy, Commerce One 4400 Rosewood Drive, Pleasanton, CA 94588, USA Tel/VMail: +1 (925) 520 4422; Cell: +1 (925) 216 7704; Pager: +1 (888) 936 9599 mailto:david.burdett@commerceone.com; Web: http://www.commerceone.com
[Date Prev] | [Thread Prev] | [Thread Next] | [Date Next] -- [Date Index] | [Thread Index] | [Elist Home]
Powered by eList eXpress LLC